Block Paving Installation

Existing driveway was scraped off to allow a new base installation. New flat top edging kerb installed at the front of the driveway. 9 inch charcoal header running around the driveway.

Levels were set to allow the surface water to drain safely away.

Call the experts today at DriveBuild Paving LTD for a free quotation on replacing or installing a new driveway. Free quotes, unbeatable prices.